Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c11/h03/mnt/198088/domains/thurber.ca/html/wp-content/themes/Divi/includes/builder/functions.php on line 5753
Water Retention and Tailings Dams - Thurber Engineering LTD.

Thurber has a long history of involvement with various dam projects including large hydroelectric structures, oil sands tailings impoundments and flood control dams. Our expertise includes site investigation, dam safety reviews, seismic studies, dike rehabilitation, earth dam design, reservoir stability, seepage analyses, laboratory testing, construction inspection and instrumentation monitoring.